Bilmar engineered, procured, installed, and commissioned a new 1500 kVA power distribution transformer and high resistance grounding system supporting critical plant operations. Engineering services included updated single line diagrams, cable schedules, construction packages, procurement of long lead electrical equipment, and fabrication of a custom control power panel through Bilmar’s partner UL 508 integration facility. The project was executed during a scheduled holiday outage, allowing the entire electrical distribution upgrade to be completed without disrupting plant production.

