Bilmar completed a Front End Loading study evaluating approximately 30 MW of behind the meter power generation for an industrial concrete manufacturing facility. Engineering teams evaluated multiple power generation technologies, comparing capital costs, operating costs, fuel availability, reliability, maintenance requirements, and long term scalability. The study provided the client with a comprehensive comparison of available technologies and recommendations supporting future investment decisions.

